3:00 p.m.
The building inspector arrived. This actually turned out to be much less painful than expected.
Each of the three Pella outside doors (two garage doors and a patio door) were missing one screw in each hinge. And there wasn't enough insulation under the tubs and around the pipes going up from the basement through the floor to the bathrooms. Finally he wasn't sure about the handrail. It wasn't continuous and that may not have passed, so it would either have to be connected or Paul would have to remount them on the other (outside corners) sides and that would be fine. Kathy doesn't want them remounted. We'll see.
It will take about a half hour to fix all the insulation and screw problems, so Paul called for a reinspection tomorrow. These can be fixed tonight after the condo is cleaned, which is the main project for tonight.
Also, the surveying was done. Paul will pick up the sheets tomorrow afternoon and deliver them to the city engineering department.