Wednesday, October 17, 2007

Egress window well is done. Whirlpool works

The crew from Finishing Touches was here on Friday, Monday and today. They finished up at twilight. The well looks great. Needs to have the drain attached yet, Paul will do that tomorrow or whenever.

Paul cut two tiles and the drywall they were attached to out of the whirlpool base. He tried to be nice about it, but it ended up that the easiest way to do this was to beat it with a hammer until everything broke. :) Once inside he found both GFIs needed to be reset. With that done, everything kicked in and worked. Now he needs to find a little piece of half inch plywood and stick two tiles to it, then screw that to the base and our access panel will be done.

The grading crew will be along as soon as it's dry enough for them to work. That likely means not tomorrow. Maybe Friday.